As the manufacturing industry continues to regain its foothold in a ‘design anywhere, manufacture anywhere’ world, industrial engineers and plant managers need to find solutions to support the global manufacturing and new product development strategies, while keeping an eye on operational efficiencies.

Today, time allotted for any activity is shrinking at a crazy pace. More often than not, you are approached by an internal customer and asked to do something for which the deadlines are impractical and cost budgets are barely there. In this kind of a high pressure environment, mistakes and rework are anathema. Progressive companies are increasingly looking at simulation to virtually evaluate the product design, plant layout, process flow, robotics, etc.

Simulation helps address most engineering problems without taking the risk or incurring the cost of real life experimentation; thereby, ensuring that you are all set to go, while cutting down the planning time considerably.

An area where simulation is commonly used is for developing new systems or improving the current system. It is also very useful for developing logics and process rules for Industrial Automation. With multiple product variants, frequent changes are being made to factory layouts as more machinery needs to fit into tighter spaces.

At the same time, all work areas, production lines, material storage facilities, etc. should be designed to perform to the highest rate and correspondingly the shortest cycle time. When designing a plant layout, manufacturers need to take into account all these issues, and ensure that an optimized facility layout is achieved in the design phase as they build new manufacturing sites or update existing ones. Doing this in a virtual environment allows manufacturers to explore different options without disrupting their current product lines, and identifying the most optimal layout.

Moreover, the new generation simulation tools give users the flexibility of writing programs to control the simulation model. Software opened up a new arena to mimic the behavior of real systems.

Simulation can also be used to test and improve the current systems through:

  • Identification of bottle necks in the system, and events, which cause bottle necks
  • Dependency effects analysis
  • Failure mode analysis
  • ‘What If’ analysis
  • Resource capacity and distribution analysis
  • Resource utilization analysis
  • Complex system rules analysis (ASRS storage, Conveyor/P+F Merging, Buffer allocation and storage, etc.)
  • Task allocation rules analysis
  • AGV request rules analysis
  • Resource swapping effect analysis
  • Shift change analysis

Clearly the benefits from simulation are multifold; as it not only helps optimize your current factory layout processes, but also ensures that you are future-ready and have the flexibility to add new variants to your existing production lines.

One of the challenges manufacturers face for gaining the maximum advantage from plant simulations is the in-time availability of subject experts. For effective simulations, manufacturers not only need simulation software experts but also a team of cross-functional experts with the understanding of manufacturing processes, ergonomics, regulatory compliances, logistics, warehousing, etc.

Maintaining an internal team, with this depth of cross-functional knowledge for a short period of time, can be expensive, forcing manufacturers to either simulate with limited understanding or leverage third-party service providers. Third-party specialists not only understand the manufacturer’s needs, but also bring industry best practices into the manufacturer’s shop-floor, making them the best option for short-term needs.

Simulation of a plant with 3D visualization enables rich graphic review of the layout and process flows for quicker decision making, thereby allowing manufacturers to quickly deploy a new variant on an existing production line or building a future ready plant. Vivek Kotru is director of marketing at Geometric.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.