SEARCH Archives
Loading
Sponsored by:

Network interface for device level ring networks

The RapID Platform Interface by Innovasic supports device level ring (DLR) networks incorporates PriorityChannel technology to eliminate network traffic loading and ensure real-time EtherNet/IP messages are delivered.

12/14/2012


The RapID Platform Interface by Innovasic supports device level ring (DLR) networks incorporates PriorityChannel technology to eliminate network traffic loading and ensure real-time Ethernet/IP messages are delivered. Courtesy: InnovasicInnovasic's RapID Platform Network Interface for Industrial Ethernet connectivity supports high performance Device Level Ring (DLR) networks. DLR is the fault recovery protocol endorsed by ODVA for network ring topologies. The RapID Platform EtherNet/IP Network Interface with DLR supports beacon rates down to 100 µs enabling fault recovery and ring restore times of less than 10 ms. Participation in the DLR ring is transparent to any host processor or host application connected to the RapID Platform.

As with all protocol versions of the Network Interface, the EtherNet/IP version with DLR incorporates PriorityChannel technology. PriorityChannel eliminates the effects of network traffic loading and ensures real-time EtherNet/IP messages are always processed on-time. A field device incorporating Innovasic’s Network Interface solution is protected from unpredictable packet delays, excessive latency, and connection failure without worrying about network segmentation or switch configuration.

Innovasic

www.innovasic.com 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.