7 steps to maximize central plant efficiency; get savings up to 60%

Central plant optimization is a process with seven key steps, and when implemented holistically, central plant optimization can deliver sustained energy savings of up to 60%, according to a Johnson Controls white paper.

02/23/2011


Central plant optimization isn’t a silver-bullet algorithm, application, or energy-efficient component. It’s a process with seven key steps, and when implemented holistically, central plant optimization can deliver sustained energy savings of up to 60%, according to "Seven Steps to Maximizing Central Plant Efficiency," a Johnson Controls white paper by David Klee, director, channel marketing and strategy, HVAC, Johnson Controls Inc., and Gary Gigot, vice president business development, Optimum Energy LLC.

Sample CPO 30 dashboard screens for operating cost differential and operating efficiency. Dashboards allows users to monitor plant performance and operating efficiency on a real-time basis. Source: Johnson ControlsThe seven steps are:

1. Design of system infrastructure – The foundation of any optimization plan is a well-designed system infrastructure that supports central plant efficiency.

2. Selection of components – The next step to achieving optimization is the smart selection of system components that will perform efficiently in real-world operating conditions.

3. Application of components – To achieve peak performance, the equipment must be applied and operated properly.

4. Automation of the system – Building automation systems (BAS) must be used to maximize efficiencies in plant operations.

5. Networked optimization software is the intelligent logic that holistically operates the plant in the most efficient manner.

6. Maintenance needs to be predictive, with ability to identify issues before they become problems.

For life – cycle efficiency, measure, verify, and manage performance data regularly as part of a continuous commissioning process.

7. Measurement, verification, and management represent the pinnacle of optimization. When real-time data is available via web-based tools anytime, anywhere, issues such as performance drift can be identifyed long before the degradation results in significant loss of efficiency or, worse, equipment failure.

www.johnsoncontrols.com

System-level automation software - Johnson Controls launched the Central Plant Optimization system-level automation software, a holistic approach to designing, installing and operating, for maximum efficiency in chilled water plants.

Also see the Johnson Controls white paper, Seven Steps to Maximizing Central Plant Efficiency.

- Edited by Mark T. Hoske, CFE Media, Control Engineering, www.controleng.com

Visit Control Engineering’s Sustainable Engineering channel.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.