2012 40 Under 40: Michael M. Collarin, PE, BEMP, LEED AP BD+C, 31
Mechanical Engineer, AME Consulting Engineers, Charlotte, N.C.
By Emma Renee Dutton, Content Specialist
Michael M. Collarin, PE, BEMP, LEED AP BD+C, 31 
Mechanical Engineer, AME Consulting Engineers, Charlotte, N.C.
Rowan University, BS Mechanical Engineering
With unwavering dedication and a pleasant demeanor, Collarin specializes in the design of HVAC, plumbing, and solar thermal systems as a mechanical engineer. Though work and volunteering keep him busy, he makes time for his many hobbies and spending time with his friends, family, and girlfriend. He and his girlfriend are expecting their first child this spring. Collarin’s sustainable and innovative designs include ground loop heat exchangers, solar thermal domestic water systems, and desiccant dehumidification systems. He performs U.S. Green Building Council LEED building commissioning, energy analysis, and energy modeling for a variety of buildings. Collarin has a track record of regularly exceeding project managers’ expectations for innovative, high-performing green buildings. He doesn’t hesitate to volunteer for challenging project opportunities, receiving rave reviews from clients and co-workers alike. He especially enjoys highlighting new green technologies within his ASHRAE roles. His dedication and willingness to devote personal time to train and mentor others has earned respect throughout the industry. He is an effective communicator with a knack for getting others to rally around him, even senior and more experienced engineers. Collarin also serves as an ACE mentor at a local high school. In his limited free time, Collarin loves to cook, mountain bike, play volleyball, and play strategic board games.
Return to the complete list of 2012 40 Under 40 Winners
Case Study Database
Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.











