Distribution vs. Transmission: Comparing Tariffs

-- Consulting-Specifying Engineer, 11/1/2000

Larger industrial and commercial building owners can restructure their electric service to best take advantage of the deregulated environment. The end-user can select a preferred generation source, and, in effect, use the electric transmission system as a common carrier to get energy to his facility, bypassing altogether the local utility's distribution system.

The decision to bypass the distribution system is primarily economic. Transmission service is generally much less expensive, and having choice implies competition on price.

However, to have access to the interconnected utility grid and multiple generation providers, the end-user's electric service must migrate from the serving utility's distribution system to the transmission system. Also, the industrial facility must assume all of the design and operational responsibilities traditionally handled by the utility.

To assist in determining whether the additional work is worth the savings, it helps to quantify them. The attached tables, which compare the distribution and transmission tariffs from a large Midwestern utility, show a typical industrial load using both tariffs, as well as the percentage savings for sample load ranges and load factors.

Table 1 - Typical Tariffs and Industrial Load Calculations

TYPICAL TARIFFS

Distribution service

Transmission service

Service charge

$10.00

$100.00

Demand charge

First 1,000 kW: 12.11 per kW

First 50,000 kVA: 10.53 per kVA

Additional demand: 10.51 per kW

Additional demand: 8.19 per kVA

Energy charge

Demand times 300: 0.01905 per kWh

Demand times 300: 0.0085 per kWh

Additional kWh: 0.00720 per kWh

Additional kWh: 0.0067 per kWh

INDUSTRIAL EXAMPLE

Distribution service

Transmission service

Service charge

$10.00

$100.00

Demand charge

1,000 kW X $12.11 = $12,110.00

3,500 kW X $10.53 = $368,550.00

34,000 kW X$10.51 = $357,340.00

Energy charge

35,000 X 300 = 10,500,000 X 0.01905 = $200,025.00

35,000 X 300 = 10,500,000 X 0.0085 = $89,250.00

(17,885,000-10,500,000) X $0.0072 = $53,172.00

(17,885,000-10,500,000) X $0.0067 = $49,479.00

Total

$622,657

$507,379

Transmission tariffs from a large Midwestern utility show that they are generally much cheaper than distribution rates. An industrial facility with a 35,000-kW load and a monthly energy consumption of 17,885,000 kWh-and a load factor of 70 percent-will have the charges shown above (fuel charge excluded) at 100-percent power factor.

Table 2 - Savings

Load (Kw)

Savings (%)

10,000

19.0

20,000

18.7

30,000

18.5

40,000

18.5

50,000

18.5

60,000

18.4

70,000

18.4

80,000

18.4

90,000

18.4

100,000

18.4

Using the tariffs shown in Table 1, potential savings were calculated over a broad range of demands, showing a consistent level of savings. Another major variable to consider is load factor, which is found by dividing the total annual energy consumed by the demand, multiplied by 8,760 hours per year. The lower values shown represent peak loads.

Table 3 - Load Factor

Load Factor (%)

Savings (%)

0.5

19.2

0.55

19.1

0.6

18.9

0.65

18.7

0.7

18.5

0.75

18.3

0.8

18.2

0.85

18.0

0.9

17.9

0.95

17.7

1

17.6

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

There are no other articles written by this author.



SPONSORED LINKS

 
Advertisement
Sponsored Links

More Content

  • Blogs

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Advertisements





NEWSLETTERS
Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

Green Scene
CSE Codes & Standards
CSE NewsWatch
CSE Fire and Life Safety Solutions
CSE Business of Engineering Management Report
CSE Electrical Solutions
CSE HVAC Solutions
Pure Power
CSE Product Showcase
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites