The Phone Man Becomes an RCDD
By Donald L. Walker, P.E., RCDD, Special Technologies Group Newcomb & Boyd, Atlanta -- Consulting-Specifying Engineer, 2/1/2005
In the old days, telecommunications consisted of only the telephone network, and the design services were provided free of charge by the local telephone company. The internal personnel responsible for this design were known as the BICs, or building industry consultants. The fee for this design was covered by telephone subscribers as a part of their regular service.
Back then, coordination was not a major concern. BICs would work with architects and engineers in the planning phases and continue throughout construction by working with the contractors.
But all of this changed with industry deregulation in 1984. Not only did it break up the phone company into the regulated bell operating companies for local service, with AT&T continuing to provide long distance, but it also shifted the ownership of the cabling in a facility to the customer.
With the design and installation of the cable plant now the responsibility of the facility owner, the need arose for the independent telecommunications design professional. One result was the creation of a new organization from the original BICs group. This association, the Building Industry Consulting Service International (or more commonly, BICSI) implemented the registered communications distribution designer (RCDD) program. This became the industry standard for certifying a telecommunications design professional. (For a description of major organizations involved in setting telecommunication standards, see "Standardized Cabling," p.40.)
So what does a telecom engineer do? In a nutshell, the RCDD designs the horizontal and vertical cabling required to support the bandwidth needs of end users. The RCDD is also responsible for coordinating the pathways and spaces to support these cables. Pathways might include cable trays and conduits for cabling distribution. Spaces include the layout of telecommunications and equipment rooms to house the equipment.
As with any discipline, coordination is key to a successful installation. With the addition of sophisticated computer networks, the need for coordinated telecom systems has grown, and so have the responsibilities of the RCDD.
RCDD's pathways and spacesThe telecommunications designer's coordination with the architect begins in the earliest stages of planning to establish room sizes and locations. Early collaboration with owners is also required to determine their needs—today and in the future.
The standard developed to assist with this design is ANSI/TIA/EIA-569-A, Commercial Building Standard for Telecommunications Pathways and Spaces, issued in Oct. 1990. (A new 569-B standard has recently been issued.) The intended purpose is to standardize specific design and construction practices for buildings to support telecommunications media and equipment. The standard states that a "properly designed and constructed facility is adaptable to change over the life of the facility." So much for how a telecommunications designer works. But what is included in the paths and spaces?
The main distribution frame (MDF) room is the central location for distributing the backbone cabling in the facility. In a typical design, this will be the location of the telephone and data switching systems. The backbone cabling will feed the intermediate distribution frames (IDF) rooms. One of the most obtrusive coordination efforts with other disciplines is routing the pathway that serves the IDF rooms from the MDF. This is typically a large conduit bank. The standard design practice is to have the IDF rooms stacked on multiple floors. This eliminates the need for continuing this coordination effort on multiple floors by having the backbone rise in the IDF spaces.
For horizontal distribution, the IDF room will distribute the cabling that feeds the workstations and all telecommunications devices. The amount of floor space the IDF serves and the density of telecommunications devices in that space determine the room size. The location and number of IDF rooms per floor depends on the size of the floor and the distance of the cable pathway. The maximum distance for horizontal cabling is 90 meters of cable length between the termination in the IDF and the termination in the workstation.
Horizontal distribution is also a major coordination effort. Typically, a large amount of cabling is needed for distribution in an already congested plenum space. The cable tray design has been the method of choice for most facility types. This allows many cables to travel to the telecommunications room in a neat and managed arrangement while offering the flexibility of easily removing or adding cabling in the future.
Another recent, popular design alternative is zone cabling, which allows the continuation of backbone cabling into the workspace area to a consolidation point (CP). The horizontal cabling will then distribute from the CP. With many CP locations, the congestion of horizontal cabling at the IDF is reduced.
Finally, it is important to remember that in addition to designing pathways and spaces, the RCDD is responsible for the physical cabling topology and choice of media. And with new technologies constantly evolving, choice of cabling options requires the expertise of a specialized telecommunications designer.
|