Advertisement
FREE subscription
Email
Print
Reprint
Learn RSS

Comparing Series-Rated and Fully Rated Electrical Systems

By Keith Lane, P.E., RCDD, LEED AP, Vice President - Engineering, SASCO, Seattle -- Consulting-Specifying Engineer, 11/1/2004

There is so much misunderstanding and biased information concerning series-rated systems. A fully rated system has advantages over a series-rated system, but the latter is a viable option and can provide savings to owners, especially in areas of high available fault current and in a network utility or large service area with high AIC ratings. In most cases, the savings for a series-rated system outweighs its potential drawbacks. An electrical engineer must be aware of all the important issues to fully evaluate both:

  1. Full selective coordination. Series-rated breakers cannot completely, selectively coordinate. For that matter, fully rated breakers cannot fully, selectively coordinate. Unless fuses are used, selective coordination is not possible anyway. A breaker's instantaneous region starts at five to 10 times the breaker rating. Therefore, breakers will trip at high-fault current regardless of whether they are series- or fully rated systems.
  2. Future build-out restrictions. An owner can get stuck using the same vendor for future build-out. There are currently no inter-vendor series-rated systems. Future additions to the electrical system would have to use the same vendor to keep a series rating.
  3. Potential equipment replacement mistakes. Future contractors can potentially make mistakes when replacing breakers, such as replacing breakers with non-series-rated breakers, which could cause potential safety hazards.
  4. Lowest series-rated breakers (i.e., 10,000 amps) cannot exceed 1% of the total motor contribution served from the panel. If the total motor load from the panel is more than 100 amps or about 75 hp, the code will not allow you to use 10,000 AIC secondary breakers. But only in rare instances will this be a problem. (See Section 240–86 of the NEC.)
  5. Extra labeling is required. Per NEC Section 110–22, field labeling must state: CAUTION—SERIES COMBINATION SYSTEM RATED ____ AMPERE. IDENTIFIED REPLACEMENT COMPONENTS REQUIRED.
  • Series rating is a viable option to a fully rated system and should be evaluated to offer the client the most cost-effective project.

  • Email
    Print
    Reprint
    Learn RSS

    Talkback

    We would love your feedback!

    Post a comment

    » VIEW ALL TALKBACK THREADS

    Related Content

    Related Content

     

    By This Author

    There are no other articles written by this author.



    SPONSORED LINKS

     
    Advertisement
    Sponsored Links

    More Content

    • Blogs

    Blogs

    • Michael Ivanovich
      Give and Take

      March 25, 2008
      Wired on Engineering Education
      Scott Siddens, senior editor, sent me an email yesterday that linked to an article on engineering ed...
      More
    • Michael Ivanovich
      Give and Take

      February 12, 2008
      Reviving the mentor mentality
      Terry Brennan came into the Solar 101 classroom at Utica, N.Y-based Mohawk Valley Community College,...
      More
    • » VIEW ALL BLOGS RSS
    Advertisements





    NEWSLETTERS
    Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

    Green Scene
    CSE Codes & Standards
    CSE NewsWatch
    CSE Fire and Life Safety Solutions
    CSE Business of Engineering Management Report
    CSE Electrical Solutions
    CSE HVAC Solutions
    Pure Power
    CSE Product Showcase
    ©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
    Use of this Web site is subject to its Terms of Use | Privacy Policy
    Please visit these other Reed Business sites