Advertisement
FREE subscription
Email
Print
Reprint
Learn RSS

The High Cost of Substandard PQ

Staff -- Consulting-Specifying Engineer, 3/1/2002

The Consortium for Electric Infrastructure to Support a Digital Society (CEIDS)—a program put together by the Electric Power Research Institute—claims that the annual cost of outages and other power-quality disturbances is running at more than $119 billion.

CEIDS researchers studied close to 1,000 firms in three economic sectors that are particularly sensitive to power disturbances: digital businesses (data processing, data storage, Internet hotels); continuous process manufacturing (chemicals, petroleum, paper); and fabrication and essential services (including manufacturing, non-electric utilities and transportation).

These three areas are said to represent 40% of U.S. gross domestic product, with roughly two million companies involved in one of these sectors. Together, they lose $45.7 billion to outages and another $6.7 billion to power-quality problems every year.

Regionally, California showed the highest losses, between $13 billion and $20 billion per year—even without rolling blackouts. Other states with high economic losses to power problems were Texas ($8 to $13 billion) and New York ($8 to $12 billion).

Industrial and digital firms lose an average of $1,477 during a one-second outage, according to the study, $2,107 for a three-minute outage and $7,795 during a one-hour outage. These companies report that 49% of the outages they experience last less than three minutes.

Further information can be found at the CEID web site: http://ceids.epri.com

From Pure Power, Spring 2002.

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author



SPONSORED LINKS

 
Advertisement
Sponsored Links

More Content

  • Blogs
  • Podcast

Blogs


Sorry, no blogs are active for this topic.

» VIEW ALL BLOGS RSS

Podcast

Senior Editor Amara Rozgus (pictured) speaks with John Suzukida, PE, president of Lanex Consulting LLC, Shoreview, Minn. This conversation is about the role of electricity in the future and zoned heating and cooling.
Cooling People, Not Buildings with John Suzukida, PE
Senior Editor Amara Rozgus (pictured) speaks with John Suzukida, PE, president of Lanex Consulting LLC, Shoreview, Minn. This conversation is about the role of electricity in the future and zoned heating and cooling.
Listen Now | Download MP3 | Subscribe
» VIEW ALL PODCASTS Subscribe Now to HVAC & Building Automation and never miss an episode
Advertisements





NEWSLETTERS
Plug in and get the latest CSE news, trends and industry updates delivered directly to your inbox!

Green Scene
CSE Codes & Standards
CSE NewsWatch
CSE Fire and Life Safety Solutions
CSE Business of Engineering Management Report
CSE Electrical Solutions
CSE HVAC Solutions
Pure Power
CSE Product Showcase
©2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites