Log In   |  Register Free Newsletter Subscription
Skip navigation
Zibb
Subscribe to Consulting-Specifying Engineer
Email
Print
Reprints/License
RSS

2008 ARC Awards judge's score sheet

By Consulting Specifying Engineer Staff -- Consulting-Specifying Engineer, 5/16/2008 11:20:00 AM

Give each section of the entry points depending on how well the tactics were implemented, based on the information provided. If you think the question was not answered at all (in other words, avoided)—or if the building failed to include certain criteria of the ARC Awards, please give the section a ranking of “1 point.” Building systems (20 pts) 
Rate the solutions to the challenges posed by the building’s architectural design and site (__/10)

Rate the building’s MEP design for innovation (__/10)

Technology (16 pts) 
Rate the use of new or unusual technologies  in the following categories:

  • Building controls and automation (__/2)

  • Electrical distribution (__/2)

  • Fire protection (__/2)

  • HVAC (__/2)

  • Lighting controls (__/2)

  • Motors and Drives (__/2)

  • Plumbing (__/2)

  • Software (__/2)

Sustainability design and documentation (40 pts)

Rate the building’s energy efficiency  (__/5 design) (__/5 documentation)

Rate the building’s IAQ system  (__/5 design) (__/5 documentation)

Rate the building’s water conservation (__/5 design) (__/5 documentation)

Rate the building’s renewable energy(__/5 design) (__/5 documentation)

Integration (10 pts)
What examples of interdisciplinary integration, for example, online collaboration, BIM, etc.,  did the project offer? (__/5)

Rate the level of control system integration for this project—BAS, fire, communication, lighting, etc. (__/5) Photography (18 pts) 
Do the photos show the building’s exterior and interior? (__/2)

Do the photos show:

  • Building controls and automation  (__/2)

  • Electrical distribution (__/2)

  • Fire protection (__/2)

  • HVAC (__/2)

  • Lighting controls (__/2)

  • Motors and Drives (__/2)

  • Plumbing (__/2)

Do the photos show specifically referenced engineered systems?  (__/2) Bonus (10 pts) 
What is the repeatability factor of the solutions from this project? (__/10) Total Building Systems points  __/20Total Technology points  __/16Total Sustainability points  __/40Total Integration points  __/10Total Photography points  __/18Total Bonus points   __/10Overall points  _/114

Email
Print
Reprints/License
RSS
Talkback
Related Content
Also by CSE Staff

Reed Business Information Resource Center

Featured Company


Most Recent Resources

Advertisement
Sponsored Links
More Content
  • Blogs

Sorry, no blogs are active for this topic.

VIEW ALL BLOGS RSS

Advertisement
NFPA 2010
NEWSLETTERS
NewsWatch
Business of Engineering Management Report
Fire, Security, Life-Safety Newsletter
Electrical Newsletter
HVAC Newsletter
Pure Power Newsletter
Product Showcase Newsletter
Greenscene
CSE Codes & Standards



Please read our Privacy Policy

About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   Free Subscription   |   Affiliate Links   |   RSS
© 2010 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy