Final phase of the project includes gas verification, owner punch, commissioning, and IBS punch.

July 2015 update:
- Finalizing medical gas verification.
- Final owner punch within the hospital is ongoing.
- Commissioning is underway.
- Continuing IBS punch and turnover.