GM Ft. Wayne plant earns zero-landfill designation

Plant earns $2 million in recycling revenue last year

12/15/2011


General Motors' Fort Wayne Assembly Plant, where Chevrolet Silverado and GMC Sierra full-size pickup trucks are built, is the automaker's first U.S. assembly plant to reuse, recycle or convert to energy all the waste created in its daily operations.

Fort Wayne recently received zero-landfill designation, joining 78 other GM landfill-free manufacturing facilities around the world.

"Assembly plants are challenged with a large amount of waste streams and byproducts, from varying types of plastics and metals to expendable packaging and containers," said John Bradburn, GM manager of waste-reduction efforts. "Fort Wayne has succeeded in finding sustainable options for these materials while working with other GM plants and suppliers to improve its impact from an overall systems perspective."

Nine GM operations that supply Fort Wayne with stampings, engines, transmissions and components are also landfill-free.

"We look at our waste-reduction efforts from a larger perspective...it's not just about Fort Wayne, it's about greening the overall footprint, including the supply base," said Bradburn.

A key to Fort Wayne's landfill-free designation was a process and material change in its paint shop enabling the recycling of processed wastewater treatment sludge that formerly was sent to landfills because of regulatory requirements.

The plant also participates in "closed loop" recycling, repurposing its manufacturing byproducts into new car parts.

Absorbent pads used to soak up oil and water from the plant floor are cleaned and reused up to three times. Afterward, GM will begin to recycle the material into Silverado and Sierra air deflectors, which also contain some of the plant's recycled packaging plastic.

Cardboard packaging from the plant is recycled into Buick Verano and Lacrosse headliners to provide acoustical padding that reduces noise in the passenger compartment.

Fort Wayne generated more than $2 million in recycling revenue last year.

The plant's sustainability progress goes beyond waste reduction. Like GM's Orion Township, Mich., assembly plant, Fort Wayne is powered in part by methane gas produced from a nearby landfill, saving the plant $1 million per year. Beginning in early December, GM will commission another boiler to run on landfill gas, resulting in additional savings and increasing the amount of landfill gas used from 15% to 21%. The renewable energy program, which started in 2002, supplements natural gas to fire one of the plant's boilers. Additional plant efficiency results include:

  • Reducing electricity use by 36% between 2006 and 2010 on a per-vehicle manufactured basis.
  • Tracking real-time electrical use and conducting departmental meetings monthly to review energy performance and cost-reduction opportunities.
  • Converting high bay lighting to efficient T8 fluorescent fixtures, saving approximately $600,000 annually.
  • Reducing volatile organic carbon emissions by 18% on a per-vehicle produced basis between 2006 and 2010 due to paint shop efficiencies like batch building vehicles by paint color.

Like many GM plants, sustainability efforts extend to Fort Wayne employees, who spread their environmental knowledge to the community. Each year, volunteers participate in litter and household hazardous waste collection efforts and mentor area students on how everyday actions impact local watersheds through the GM Global Rivers Environmental Education Network program.

Fort Wayne recently received a $275 million investment to build the next-generation full-size pickups, creating or retaining 150 jobs.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.