SEARCH Archives
Loading
Sponsored by:

Generator sets

The C15 and C18 generator sets by Caterpillar feature rear-mounted, side-by-side power and control panels and an integral fuel tank base.

08/24/2012


The C15 and C18 generator sets by Caterpillar feature rear-mounted, side-by-side power and control panels and an integral fuel tank base. Courtesy: CaterpillarCaterpillar Inc. has made several enhancements to its C15 ACERT and C18 ACERT generator sets, improving their overall performance and enclosure options. Rated 410 to 700 kVA (365 to 600 kW), these enhancements to the Cat C15 and C18 diesel generator sets are suitable for prime or standby power, and are available in a wide range of configurations with optional equipment. A number of improvements were made to the enclosures, which are available in either sound-attenuated or high ambient temperature configurations. The enclosed models feature rear-mounted, side-by-side power and control panels and a standard, integral fuel tank base with drip tray, allowing for 8 hours of run time at 100% prime rating. The top tank plate is now sloped to contain any accidental oil, coolant, or fuel spills. An optional integral dual-wall fuel tank base for total fluid containment is also available.

Caterpillar Inc.

www.cat.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.