SEARCH Archives
Loading
Sponsored by:

Ethernet switches have PoE Plus for higher power devices

Belden MACH104-16TX-PoEP Ethernet switches with Power over Ethernet Plus (PoE Plus) capability (the IEEE 802.3at standard) delivers increased power for Ethernet-enabled devices.

08/03/2011


Belden (NYSE:BDC) introduced the MACH104-16TX-PoEP Ethernet switches with Power over Ethernet Plus (PoE Plus) capability in accordance with IEEE 802.3at standards. (The PoE+ standard allows higher power to go through the Ethernet cable, up to 25.5 W.)

Belden Mach104-16TX-PoEP Ethernet switches with Power over Ethernet Plus (PoE Plus) capability, in accordance with IEEE 802.3at standards. (The PoE+ standard allows higher power to go through the Ethernet cable, up to 25.5 W.) Courtesy: Belden

As new technologies evolve and a new breed of Ethernet enabled devices, such as IP cameras, VoIP phones, and video conferencing come on the market, the need for increased power and speed over Ethernet networks is of paramount significance.

The MACH104-16TX-PoEP series of hardened Ethernet workgroup switches are managed all-Gigabit switches with sixteen Gigabit PoE/PoE+ ports and four additional Gigabit RJ45/SFP combo ports. A version with two additional 10 Gigabit XFP ports is also available to facilitate high bandwidth backbone requirements. Power options include a choice of single/dual 110/220 V ac inputs or external 48 V dc external inputs for fanless operation (0 degrees C to + 50 degrees C). Each chassis, measures 448 mm x 44 mm x 345 mm, and can be mounted in a 19-in. cabinet.

The switch’s management functionality reportedly facilitates media redundancy systems such as Hiper ring, MRP (IEC ring function) and rapid spanning tree to ensure a high level of network availability. The extensive security mechanisms provided include multi-client authentication via Radius server, access control via IEEE 802.1x or MAB (MAC Authentication Bypass), IP and MAC port security plus SNMP V3 and SSH. True SNMP functionality allows use of centralized management software - such as Industrial HiVision – for commissioning, remote management, diagnostics and troubleshooting.

Each switch apparently comes with an integrated V.24 and USB interface. The V.24 interface is an RJ11 socket for optional (local) serial configuration, while the USB socket can be coupled with an ACA 21 adaptor (sold separately) to store the configuration data, recall it as necessary, and apparently upgrade or downgrade the operating software automatically, bringing potential downtime to an absolute minimum.

- Edited by Chris Vavra, Control Engineering, www.controleng.com

http://www.controleng.com/new-products/industrial-networks.html



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.