CMMS: Work out the kinks in maintenance

When it comes to maintenance, don’t underestimate the value of CMMS consulting and maintenance organization analysis.

By Paul Lachance

12/28/2012



A longtime client (a large facility) approached us about taking their CMMS to “the next level.” After holding meetings with the maintenance staff, we discovered frustration between the technicians and their supervisors about the basic functions of their CMMS. “We need the system to go faster,” was the common complaint of users during our meetings. I instantly wondered how effective they were in using the core functions of the system.

The client had been using the CMMS productively for years and had amassed tens of thousands of work orders (WOs) and related items. While the maintenance team had attended training soon after installation, few of the original users were still in the same “troop level” positions as a result of turnover and promotions within the organization. Unused (or under-used) training and support assistance had led to some poor user behaviors.

For example, routine preventive maintenance items (PMs) on 50-plus identical assets, which rarely warranted more than an acknowledgement of task completion, were each being closed individually by a single technician. While closing a single WO only takes seconds, multiply that by 50 and you’ve wasted nearly enough time to bring maintenance to a screeching halt. The one technician actually had a fairly easy option to close all 50 WOs at once directly within the software. As a result, this process was optimized: all of those extra clicks were reduced to one and all 50 WOs can now be closed in a few seconds rather than one at a time.

This example was just one of many areas in which operational use of the CMMS was enhanced as a result of analysis and training. Is the system any faster? The software is the same, the servers are the same, but users are now spending less time doing routine tasks with more available wrench time and maintenance planning. In the end, the users are faster and more efficient.

By assisting the client organization to focus on additional work order data, such as problem codes, cause codes, and more, we were able to guide them toward better analysis and, ultimately, better CMMS ROI. We were able to introduce a wider use of the CMMS so more employees could take advantage of capabilities beyond WOs and PMs, like planning for capital expenditures, managing replacement parts inventory, managing outside vendor repairs and contracts, meeting safety compliance, and so on.

The takeaway here is simple: don’t underestimate the value of CMMS consulting and maintenance organization analysis. What started out as a project to take things to “the next level” ended up as a cleanup/optimization project that allowed for a nice combination of both improving a client’s current maintenance operations while introducing software functionality for an overall improved customer experience.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.