HVAC

Engineers and designers at Southland Industries used multisystem, or multitrade, pipe racks that integrated into the building access and structure. Courtesy: Southland Industries
HVAC June 11, 2021

Top 5 Consulting-Specifying Engineer articles: June 4-10, 2021

Read the best articles from the past week. Specifying HVAC systems, designing standby power systems, power for fire/life safety systems, 40 Under 40 winners, and modeling electrical systems.

By Chris Vavra
HVAC March 31, 2021

Consulting-Specifying Engineer March 2021 issue

Read the March 2021 digital edition to learn about air handling systems, emergency lighting designs, NFPA 72 and more.

By Consulting-Specifying Engineer
Courtesy: CFE Media and Technology
Boilers, Chillers July 13, 2021

Case study: Office chiller and cooling plant controls replacement

Chillers, pumps, and plant controls were replaced at a high-rise commercial office building in downtown Chicago

By Daniel McJacobson, PE, LEED AP, BCxP
Courtesy: HKS Inc. Architects
Heating and Ventilation October 21, 2020

Navigating hospital ventilation design during COVID-19

COVID-19 has impacted ventilation design considerations in health care settings in a prominent way

By April Woods
Courtesy: RMF Engineering
Plumbing, Pumping September 11, 2020

How to select a commercial water heater

As mechanical and plumbing engineers specify a water heater in education buildings, several considerations must be studied

By Michael Scruggs