Hospital Levels 2, 4, 5, and 6 being roughed-in; South Clinic Level 1 drywall installation; Parking garages underway

As of Feb. 12, 2014:
- Currently roughing-in systems on Levels 2, 4, 5, and 6 in the hospital. Basement and Levels 1 through 4 have drywall wall installation underway.
- The West Clinic has ceilings and diffusers being installed, the North Clinic is roughed-in and awaiting paint and ceilings. The South Clinic has drywall being installed on Level 1 and rough-in is underway on Level 3.
- All three parking garages are underway.