SEARCH Archives
Loading
Sponsored by:

Variable-speed drives

Yaskawa America offers the Z1000 family of variable-speed drives.

01/06/2012


The Z1000 family of variable-speed drives from Yaskawa America Inc. is designed for building automation applications such as fans, pumps, and cooling towers through 500 hp. Its features begin with an easy-to-read LCD operator with hand-off-auto functions. An internal real-time clock with time/date stamping and timer controls allows for speed variations without the need for external controls. A built-in 5% line impedance reduces input harmonic distortion, while a 5 kHz carrier frequency with dynamic noise control provides quiet motor operation. An on-board EMI/RFI filter compliant with IEC 61800-3 minimizes interference of surrounding equipment. All Z1000 drives also feature embedded BACnet communications (BTL certified), along with Modbus/Memobus. Applications macros are available to facilitate quick and easy setup.

www.yaskawa.com 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.