SEARCH Archives
Loading
Sponsored by:

DC power supply

DS460SDC-3 front end power supply by Emerson Network Power

11/28/2011


The DS460SDC-3 is a compact 460-W bulk front-end power supply that can achieve a high typical conversion efficiency of 90% at 50% full load. It is ideal for systems that use distributed power architectures, especially in computing, storage, networking, and data communications, providing co-location centers with a very flexible means of addressing evolving power needs. The DS460SDC-3 is pin-for-pin compatible with Emerson Network Power’s ac-input DS460S-3 bulk power supply, enabling users to switch easily from an ac to a dc supply infrastructure. The DS460SDC-3 has a length of just 7.75 in., making it ideal for applications where rack depth is limited. The power supply also features active current sharing and supports N+1 redundancy operation. The DS460SDC-3 power supply has an operating temperature range of -10 to 50 C and features a built-in cooling fan with automatic speed control. The DS460SDC-3 has a high mean time between failures of 500,000 hours at full load and 50 C ambient operating temperature.

www.emerson.com .



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.