Carl R. Darnall Army Medical Center November update

Functional performance testings on the West Clinic and HVAC systems are underway. Finishes and punch lists at the North Clinic are substantially complete.

11/05/2014



Green roof between South Clinic and Hospital. Courtesy: Gary Lovewell, Aero PhotoNovember 2014 update:

  • West Clinic functional performance testing is underway.

  • Completed finishes in the North Clinic and punch lists are substantially complete.

  • North Clinic TAB has started.

  • South Clinic pre-functional equipment checklists began two weeks ago.

  • The Hospital basement and Level 1 finish are now taking place.

  • Point-to-point controls check-out on equipment is being performed in the Hospital basement and level 1.

  • Kitchen equipment installation continues onward.

  • Preparation began for functional performance testing on the chilled water pumps, heating hot water pumps, heat recovery pumps, unit heaters, and domestic water booster pump skid in the central utility plant.

 

 

Trash and linen chutes at logistics building. Courtesy: Gary Lovewell, Aero Photo

Aerial photo taken on October 10, 2014. Courtesy: Gary Lovewell, Aero Photo



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me