SEARCH Archives
Loading
Sponsored by:

Bridging the climate change gap

I asked an assistant recently to perform some research regarding the science of climate change. The instructions were simple, requiring research that would support definitive opinion on the science arguments currently in play.

Scott Phillips, P.Eng., LEED AP, Stantec Consulting Ltd., Calgary, Alberta

11/18/2009


    View the full story, including all images and figures in our monthly digital edition

     

    I asked an assistant recently to perform some research regarding the science of climate change. The instructions were simple, requiring research that would support definitive opinion on the science arguments currently in play.

     

    The reason for the request is that as engineers we should be offering our clients a reasoned perspective on what the world is really facing. We should be in a position to advise how they should make positive steps forward in their planning related to climate change.

     

    The astonishing result is: What answer would you like to hear? There are reasoned arguments supporting diametrically opposed views on the impact of climate change.

     

    There already have been strong moves by government to combat climate change, and the tea leaves show that this is just the beginning. Regardless of belief, engineers need to advise owners that they have to prepare for the inevitable future of Greenhouse Gas regulation.

     

    As a direct result of the challenge of climate change we have seen:

     

    • Design solutions that ease the burden on engineering infrastructure, whether through better stormwater management, on-site wastewater treatment, or reduced electrical and heating demand.

    • A fundamental shift to densify population centers, lessening impact to infrastructure development and transportation. This in turn has led to a valuation of human social spaces and creation of more green space.

    • Greater study efforts related to indoor environments with respect to temperature, humidity, and quality. This has led to significantly better understanding of human environmental tolerances and changes to design parameters.

    • The value of daylighting on the human psyche and the workspace.

    • An acknowledgement that not all space should be redeveloped and that progress can be different from knocking down old and building new.

    • An appreciation for past creations and the skill and understanding that went into past works. Because it is new doesn't mean it is better.

    • An actual valuation of green. While we are still far from a monetary valuation in this sense, society is forcing a valuation process.

    What is the point? Engineers are generally the bridge between hard science and society. The engineering profession holds a great deal of responsibility in getting it right. With the science unresolved or at least in question, engineers have to gather measurable information and data in support of better solutions. Verify the data from the hypothesis when it is built. Resist opinion and concentrate on touching the world lightly. Be firm in what is known and what is conjecture.

     

    Why is this important? The next great challenge is climate change adaptation. As the climate changes, design and construction must change. Adaptation is a risk management discussion. How big do you make something when you know the design parameters will change over time but not how much they will change? It is clear that insufficient information is available, nor will enough information be available when it is needed. It is fundamentally important to gather performance information from past projects to project into the future. It is also fundamentally important to consider the adaptation question from a perspective of resiliency. Knowing that the climactic conditions will change, how will the design fare over time? If it were done a little differently, could it adapt better to the unknown?

     

    Finally, don't kid yourself. Society is looking to the engineering profession to create things that work. They care not that the rules may be changing. This is also becoming a legal question, as guarantees of project performance are becoming more prevalent.

     

     

     

    Author Information

    Phillips is vice president and practice leader for sustainability with Stantec Consulting. He holds a degree in mechanical engineering. His career has been exclusively dedicated to private consulting with experience in a varied number of project areas. Phillips has actively participated on boards including the Assn. of Consulting Engineers of Canada (past vice chair) and the Consulting Engineers of Saskatchewan (past chair).

     



    No comments
    Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
    Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
    The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
    40 under 40
    Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
    Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
    Case Study Database

    Case Study Database

    Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

    These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

    Click here to visit the Case Study Database and upload your case study.

    Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
    Preventing arc flash, Backup power fuel choices, power for high-tech facilities
    Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

    Poll of the Week

    What percentage of your time is spent commissioning building projects?
    0% to 25%
    26% to 50%
    51% to 75%
    75% to 100%


    Click Here for Poll Archives
    Sponsored by:

    About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
    Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
    Control Engineering | Plant Engineering | Consulting-Specifying Engineer
    All content copyright © 2010-2013 CFE Media. All rights reserved.