Primera Engineers Ltd.: William Jones College Preparatory Academy

New construction at an educational facility.

08/14/2014


William Jones College Prep. Courtesy: Primera Engineers Ltd.Engineering firm: Primera Engineers Ltd.
2014 MEP Giants rank: 94
Project: William Jones College Preparatory Academy
Address: Chicago, Ill., U.S.
Building type: Educational facility
Project type: New construction
Engineering services: Electrical/power, fire/life safety, HVAC/mechanical, energy/sustainability, and plumbing/piping
Project timeline: 4/1/2010 to 7/31/2013
MEP/FP budget: $25,000,000

Challenges

With urban environments becoming more popular and competitive, we are seeing a trend toward higher-quality design, especially when it comes to educational facilities. The William Jones College Preparatory Academy project involved the design of a 280,000-sq-ft replacement school in downtown Chicago serving 1,200 students. The new school is unique in that it is a mid-rise, seven-story school building that combines many auxiliary spaces used for an array of activities. Together with the renovation of the existing school next door, the new William Jones College Prep. Courtesy: Primera Engineers Ltd.building nearly doubled the capacity of this high-performing public school. A major challenge for this project was coordinating the mechanical, electrical, plumbing, fire protection, and electrical/information technology pathways with the structure and architectural features of the building. Since it was also set to achieve LEED Gold certification, the project needed to consider the necessary sustainable features as well.

Solutions

To overcome the coordination effort needed for all services, construction documents were generated using BIM, which included all ductwork, piping, conduit, electrical pull boxes, light fixtures, panels, fan coils, and ceiling-mounted devices. Primera worked with the architect and specialty consultants—which included: swimming pool designers, kitchen designers, audio visual and acoustic designers, theatrical lighting designers, interior designers, and security designers—to ensure that everyone remained up-to-date on design decisions. The building models were traded among all of the specialty consultants on a weekly basis, and clash detection was performed periodically to address any conflicts. To address the requirements of LEED Gold certification, Primera used an energy-efficient HVAC system using a dedicated outside air distribution system. This system offered unique advantages over the traditional variable air volume (VAV) system, including: guaranteed ventilation air to meet air quality and William Jones College Prep. Courtesy: Primera Engineers Ltd.building pressurization needs; significantly reduced duct sizes allowing for efficient floor-to-floor heights; superior humidity control; and energy recovery from building exhaust air. The electrical lighting design also used LED lamps, occupancy/vacancy sensors, and daylight harvesting controls. Finally, the heating hot water and domestic hot water systems used condensing boiler technology with projected boiler efficiencies exceeding 90%. The resulting energy usage as predicted by the energy model demonstrates that the building is 45% more efficient than that required by the ASHRAE energy baseline with a predicted site energy use index (EUI) of 70 kBtu/sq ft/year. The state-of-the-art school was designed to seamlessly integrate with its urban surroundings, and provides a better learning environment and improved education access for students from Chicago’s underserved multicultural neighborhoods.

 

 

 

 



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me