Need continuing education credits? Join Us For Five Days of Education on the Industry's Leading Topics beginning October 5th!Save Your Seat

Mission Critical

Mission Critical January 1, 1970

High-Level Integration for a High-Tech Office

For high-tech, mission-critical companies like Townsend Analytics Ltd. of Chicago, a specialist in computer applications for Web-based finance, the ideal office is one where integrated building systems produce the right environment both for equipment and personnel. For its 11,000 square feet of space on the 19th floor of Chicago's 100 South Wacker building, the company was looking to integrate...

By ANIL AHUJA, P.E., General Manager Exelon Services Westchester, Ill.
Mission Critical January 1, 1970

New products literature

Magnetic-drive pumps are specifically designed to handle difficult fluids such as corrosives, pollutants, ultrapure liquids and toxics. This seamless pump can handle flows up to 1,500 gpm at 2,900 rpm and 1,760 gpm at 3,500 rpm. (Model ICM by Goulds Pumps) Circle 1 Structured cabling system doubles the bandwidth of the proposed category-6 standard, tested to perform at up to 400 MHz.

By Staff
Mission Critical January 1, 1970

Dollars for Homeland Security

As this past Saturday marked the third anniversary of 9/11, anti-terrorism measures continue to be on the mind of the federal government. The U.S. Dept.

By Consulting Specifying Engineer Staff
Mission Critical January 1, 1970

Minnesota Researches Energy Conservation, Ventilation and IAQ in K-12 Schools

New research recently completed in schools provides additional insight into energy conservation, ventilation and indoor air quality (IAQ). The research utilized continuous IAQ monitoring technology, which measures temperature, relative humidity, carbon monoxide, carbon dioxide and odors and gases (TVOCs). Two comprehensive studies, conducted simultaneously in more than 100 classrooms in 11 Minnesota K-12 schools, will assist education professionals and decisions makers in all levels of state and federal government. Study Descriptions “Schools Air Monitoring Project for Learning & Energy Efficiency” (SAMPLE 2). The study was funded by a Minnesota public utility company as part of the State of Minnesota’s Conservation Improvement Program (CIP).

By Consulting Specifying Engineer Staff
Mission Critical January 1, 1970

DALI Lighting Lab Debuts at Penn State

Penn State’s Department of Architectural Engineering has installed the first Internet-controllable lighting laboratory in the world, based on the digital addressable lighting interface (DALI). The DALI interface allows users from any PC and any location to control any lamp in this laboratory with a web browser; observe the effects with a web camera; and remotely monitor energy use and time-of-day use. Most recently, the control system was on display at Lightfair 2004 in Las Vegas.

By Consulting Specifying Engineer Staff
Mission Critical January 1, 1970

Speedway Club at the Texas Motor Speedway Features Latest Life Safety

The Speedway Club is a nine-story tower in a famous racing setting. It is located outside the first turn of the 1.5-mile main track at Texas Motor Speedway in Fort Worth. Both the Speedway and The Speedway Club are recognized as among the most modern in the world, and both are busy almost every day of the year. The Speedway hosted its inaugural NASCAR Winston Cup and Busch Series races in April 1997 and its first Indy Racing League and NASCAR Craftsman Truck events that June.

By Consulting Specifying Engineer Staff
Mission Critical January 1, 1970

The New Soldier Field: Melding Tradition with Modern Convenience

As one of the founding teams in the league that would become the NFL, the Chicago Bears are steeped in traditions that run deeper than most. The roster of retired Bears jerseys on display in the lobby of the team headquarters is awe-inspiring, the names timeless: Blanda, Butkus, Ditka, Payton, Sayers. The faithful converge on Soldier Field every home Sunday, win or lose, to shiver in the open air as the wind howls off Lake Michigan. Even the stadium itself, until recently a crumbling Greek temple with peeling plaster and questionable plumbing, has been part of the team’s mystique for more than 30 years. In such a franchise, change does not come easy.

By Consulting Specifying Engineer Staff
Mission Critical January 1, 1970

Stay Cool Round-the-Clock: 7×24 Cooling in Health-Care Facilities

Creating and maintaining comfort conditioning in hospitals has long been the design goal and an operational requirement of HVAC systems, not only for patients and health-care providers, but also for equipment such as telephone rooms and computer rooms. Lately, it is becoming even more of a challenge. Most central air systems operate 24 hours per day, seven days per week to provide comfort conditioning and minimum air change rates as required by code. But the increasing use and need for digital communications, computerized patient records, digital radiology imaging and storage systems are creating an increasing need for year-round cooling in hospitals and related health-care facilities. Many new types of equipment are creating larger cooling loads: digital radiographic equipment such as computed tomography (CT) scan equipment and heat exchanger; cardiac cath lab and EP lab computer equipment, magnetic resonance imaging equipment, computer rooms themselves; and uninterruptible power supplies.

By J. Patrick Banse, P.E., Smith Seckman Reid, Houston