The economic feasibility of converting a substation from distribution to transmission service can be determined from the following relationship:NAS = SAV + DEREG - CONV - OM, where:NAS = Net annual savings.SAV = Annual savings due to switching from the distribution tariff to the transmission tariff.DEREG = Estimated annual savings due to buying power in a deregulated environment.

By Consulting Specifying Engineer Staff November 1, 2000

The economic feasibility of converting a substation from distribution to transmission service can be determined from the following relationship:

NAS = SAV + DEREG – CONV – OM, where:

NAS = Net annual savings.

SAV = Annual savings due to switching from the distribution tariff to the transmission tariff.

DEREG = Estimated annual savings due to buying power in a deregulated environment.

CONV = Annual carrying charges for converting to transmission service.

OM = Annual operations and maintenance cost of the transmission substation.