July 29 Southland Industries update: Level 3 air handling units set, condenser water system testing

Hospital Level 3 air handling units have been set; Condenser water system in the CUP is being tested; Rough in testing begun in the west clinic.

By Gary Lovewell, LEED AP BD+C July 29, 2013

As of July 29, 2013:

  • The hospital level 3 air handling units have been set, and connections to the main piping and duct systems are ongoing. Only the hospital bedtower and operating room air handlers remain to be set.
  • The condenser water system in the CUP is being tested and will begin passivation shortly.
  • We have begun rough in testing in the west clinic; rough in underway in north clinic and hospital levels 0-2

Gary Lovewell is a senior project manager at Southland Industries.