Prescription for fire/life safety design in hospitals, health care facilities

Hospital and health care facility projects are especially important due to their sensitive nature. Fire and life safety are key in hospital design.

11/26/2013


Michael Chow, PE, CxA, LEED AP BD+C, Member/Owner, Metro CD Engineering LLC, Powell, Ohio. Courtesy: Metro CD EngineeringGeorge Isherwood, PE, Vice President, Peter Basso Associates, Troy, Mich. Courtesy: Peter Basso AssociatesMichael Lentz, Associate, RMF Engineering, Baltimore. Courtesy: RMF Engineering

Participants

Michael Chow, PE, CxA, LEED AP BD+C, Member/Owner, Metro CD Engineering LLC, Powell, Ohio

George Isherwood, PE, Vice President, Peter Basso Associates, Troy, Mich.

Michael Lentz, Associate, RMF Engineering, Baltimore


 

CSE: How might the complexity and scale of fire/life safety systems in hospitals and health care facilities vary from other types of structures?

Lentz: Due to the fact that most health care facilities cannot be evacuated and have to be designed to defend a fire, in-place smoke control systems can become very complex. Smoke zones need to be designed so that when a zone is alarmed, that specific zone can be kept at a negative pressure to the adjacent smoke zones in order to contain all of the smoke in the zone under alarm. We have found that the best way to accomplish this is under the smoke control sequence of operation, we convert the air-handling unit (AHU) that serves the smoke zone under alarm to 100% outside air. We are using the return fan now as a smoke exhaust fan. A modulating smoke control damper is installed on the supply air duct serving the zone, and it modulates to maintain the zone at a negative pressure. The supply air smoke control damper is controlled by a differential pressure sensor located at the doorways between the zone under alarm and all adjacent smoke zones. 

CSE: What are some important factors to consider when designing a fire and life safety system in hospitals and health care facilities? What things often get overlooked?

Lentz: Smoke control systems are often overlooked, which can require a hospital to shut down critical AHUs during a fire/smoke alarm. Atrium evacuation systems and stair pressurization systems are also often overlooked, which can be very difficult to install and engineer after construction or even during the design process without a lot of redesign. When designing smoke control systems or atrium smoke evacuation systems within the building’s normal HVAC system, what is generally overlooked is the fact that the components of the HVAC system now have to be UL listed for that use and now have activation or communication with the fire alarm system.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
April 2018
VRFs, lighting controls, BIM coordination, and more
March 2018
Sizing water pipes, ASHRAE 90.1, recovering waste heat, and more
January/February 2018
Sizing water pipes, ASHRAE 90.1, recovering waste heat, and more
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me