Figure 1: The 11 acre solar array at the Mandalay Bay Resort Conference and Convention Center is the second largest rooftop solar array in the world. It consists of 21,325 modules that produce more than 6.4 MWp and is configured to provide 20 percent of the facility’s power demand. Courtesy: DLR GroupEngineering firm: DLR Group
2015 MEP Giants rank: 34
Project: Mandalay Bay Solar Array
Address: Las Vegas, United States
Building type: Hotel/motel/resort
Project type: Addition of on-site renewable solar system
Engineering services: Electrical, power; Energy, sustainability
Project timeline: 4/1/2014 to 1/15/2015
MEP/FP budget: Classified

Challenges

Reducing waste and conserving energy are both part of MGM Resorts International’s strategic plan for environmental responsibility. DLR Group’s design for the rooftop solar array at the Mandalay Bay Resort Conference and Convention Center creates a striking presence along the Las Vegas skyline and visible proof of MGM’s sustainable commitment to both hotel guests and Las Vegas residents.

Figure 2: Instead of using standard large inverters, the Mandalay Bay array uses 203 small string inverters installed at a 15-degree to horizontal angle. To reduce DC losses, inverters are installed adjacent to the solar arrays in the tilted position. Courtesy: DLR GroupSolutions

The scope of this project encompassed the design of the second-largest rooftop solar array in the world at the Mandalay Bay Resort Conference and Convention Center in Las Vegas. As one of the first utility-scale rooftop arrays ever designed, the project consists of 21,325 modules that cover 11 acres of roof area allowing for peak energy production throughout the day, with max production in the summer months. Producing more than 6.4 MWp of clean energy, the array is configured to provide more than 20% of the hotel and casino’s power demand using a state-of-the-art monitoring and control system.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me