
Speakers: Vicki Elving, PE, Associate Vice President, North Texas MEP Lead, HDR, Dallas
Vicki Elving, PE, from HDR looks at data center design from a full-load perspective, which allows the building to be designed to meet the building’s cooling intent when it is fully occupied. How can engineers look at the intent of design while balancing energy efficiency and overall reliability? Listen to this conversation to help plan the entire data center site.