Designing resilient buildings

Existing building commissioning (EBCx) is a vital factor in designing resilient buildings.

By Woody Thompson, PE, CxA, CEM, REP, CBCP, CPMP, LEED AP; RS&H, San Antonio April 9, 2019

Resiliency needs to be introduced as an integral part of the commissioning process to ensure facilities can quickly bounce back from disaster, either natural or man-made. It is time to focus not only on bulk-power integrity, but also on applying energy resiliency at the facility level.

The need for energy resilience at the facility level was illustrated by the devastating hurricanes that ravaged the Texas Gulf Coast, Houston, Florida, and Puerto Rico, and the multiple earthquakes in Mexico. Ensuring that facility systems maintain reliability and support energy resiliency is the ultimate focus and goal of successful existing building commissioning (EBCx). Facility EBCx is a critical, if not the most important, aspect of energy resiliency.

The components of energy resiliency are divided into three focus areas: utilities, security, and facility. Predominant attention in resiliency is at the utility level (electricity, gas, and water). This complements the security aspects of energy resiliency that focus on physical building security, communications, and cybersecurity. Finally, at the facility level, the focus is on HVAC, lights, power, life safety, and plumbing, which are all vetted in the EBCx process. These components combined are meant to ensure that bulk power systems are secure, prepared to withstand attack, and able to rapidly recover from a natural or man-made disaster.

The commissioning process 

Commissioning is a quality-focused process structured to enhance the delivery of a project by documenting that the facility has met all the owner’s project requirements. Existing building commissioning (EBCx) is performed to ensure that the existing building’s systems and assemblies are operated and maintained to meet current facility requirements (CFR). Retro-commissioning is the process applied to an existing building that has never been commissioned, where the focus is on the building’s performance and how to improve the utility and energy consumption. Recommissioning is the process that is applied to an existing building that was commissioned but no longer meets the operational needs of the owner.

The EBCx process has five stages: preplanning, planning, investigation, implementation, and hand-off. During the planning phase, a thorough understanding of the CFR is needed. The CFR is created from the functional requirements of the existing building, which include building use and occupancy, sustainability, physical and cybersecurity, energy efficiency, life safety, HVAC, power/lighting, and water usage. Through the prism of energy resiliency, it is important to identify the contingency operational needs of the facility in the EBCx planning phase.

By offering diverse commissioning options, owners can see a rapid return on investment through reduced risk, significant energy savings, waste reduction, and many other benefits. The sooner commissioning can be accomplished during design and construction, the facility will end up being more durable as a result.

Energy resiliency and EBCx

A building’s resiliency is commonly overlooked. Many existing buildings are not performing to the design’s original intent or not taking full advantage of recent innovations and energy-saving strategies, making the facility vulnerable to natural or man-made disasters. Resiliency and commissioning measures are being implemented, but they are applied independently of each other. If the two concepts are combined to work together, buildings will be better prepared to withstand an attack and mitigate damage, avoiding the additional costs of time and resources to recover.

Building codes, financing, training, incentives, and education programs for facility managers are the foundation of resiliency planning. A piece missing from that foundation is commissioning. By implementing commissioning, resiliency planning goals can be prioritized using the CFR. Introducing commissioning concepts early will enhance resilience plans, contribute to overall facility planning, reduce system downtime, and maintain the facility’s mission readiness.

The next time a devastating disaster hits a facility, there will be comfort in knowing that it is a resilient, commissioned building that will withstand the event and save time and money in the long run.


Author Bio: Woody Thompson is the commissioning and energy region leader for RS&H, with more than 26 years of experience. He has given numerous presentations on the commissioning process at conferences for the U.S. Department of Energy, Society of American Military Engineers, AABC Commissioning Group, Association of Energy Engineers, and others.

Related Resources