University Health System—Trauma Tower, Central Plant Expansion

New construction: University Health System—Trauma Tower and Central Plant Expansion; TMAD Taylor and Gaines (TTG)

08/09/2012


University Health System, Trauma Tower and Central Plant Expansion.Project name: University Health System—Trauma Tower and Central Plant Expansion

Location: San Antonio, Texas

Firm name: TMAD Taylor and Gaines (TTG)

Project type, building type: New construction, hospital

Project duration: 4.5 years

Project completion date: January, 2014

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $150 million

Engineering challenges

One of the challenges encountered was to deliver all air handling unit condensate to the cooling tower as makeup water.

Solutions

We overcame this challenge by providing collection tanks on each level of the hospital that contained air units. A separate line was then routed to the common cooling tower basin from each collection tank. This allowed the use of existing elevation to move the water to the cooling towers basin, without pumps and without overflowing air units or tanks at lower levels.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating electrical and HVAC systems; Tracking and conserving facility water use; Energy code advancements; The future of professional engineers
Control noise, vibration in building design: Tackling acoustics and design issues; High-performance building design; NFPA 99; Combined heat, power
40 Under 40; Stand-alone medical buildings; NFPA 92; Specialty fire suppression; Applying 90.1 in lighting design
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me