Top Consulting-Specifying Engineer Articles, March 2012

The most visited articles at www.csemag.com during March 2012 include changes in the NEC, how to save water in commercial buildings, LEED changes, analyzing the lifecycle of HVAC systems, and active high-speed switching mitigating arc flash.

04/03/2012


March 2012's leading Consulting-Specifying Engineer articles include:


Key Changes In The 2011 NEC

Kenneth Lovorn explains and highlights changes made to the NEC code in 2011 and how they affect engineers.

10 Ways to Save Water in Commercial Buildings

Mark Spigarelli outlines 10 ways engineers can save water across both mechanical and plumbing systems within commercial buildings. 

LEED 2012 Anticipated Changes

Edna Lorenz and James K. Vallort explain how performance accountability and design integration are key elements of the likely changes to the LEED standards for credits.

Figure 3: This photo of a healthcare facility switchgear rear cable compartment shows a close-up view of the phase run-back with the bus cover panel resting on the phase bus. Courtesy: Schneider ElectricActive High-Speed Switching Can Mitigate Arc Flash

Michael Divinnie and James Stacy write about how innovative solutions, operator training, and safe work practices are being used to address arcing-fault hazards in medium-voltage switchgear.

Analyze The Lifecycle Of HVAC Systems

Cole Roberts, Andrew Rhodes, and Alexander Hespe write about how performing a series of cost analyses when designing HVAC systems is an economically justifiable method for selecting the appropriate design solution.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.