BRAC 133 Office Towers

Existing building retrofit: BRAC 133 Office Towers; Sebesta Blomberg

Source: Sebasta Blomberg

08/09/2012


BRAC 133 at Mark CenterProject name: BRAC 133 Office Towers

Location: Arlington, Va.

Firm name: Sebesta Blomberg

Project type, building type: Existing building retrofit, office

Project duration: 2.7 years

Project completion date: Sept. 15, 2011

Engineering challenges

This fast-track design-build project required an intense level of rigor from Sebesta Blomberg. High-end security systems, state-of-the-art HVAC strategies, and complex building automation systems were thoroughly tested while accommodating a compressed schedule. More than 1,500 functional performance tests were developed, conducted, and tracked to completion to ensure that building systems operate effectively. Aggressive scrutiny was applied to key components, such as central plant heating/cooling systems, data centers, building control centers, and emergency electrical systems.

Solutions

Sebesta Blomberg drew on its national corporate presence and assembled an experienced team to accommodate the demanding schedule and extraordinary scope of work. Equipment and systems were tested as they became available. Unparalleled flexibility and clear communication lines were required and established with project stakeholders. Construction completion and full complex operation were achieved one month ahead of schedule.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.