SEARCH Archives
Loading
Sponsored by:

Advanced controls for refrigerant chiller

Emerson Network Power's Libert iCOM controls have been added to the XDC refrigerant chiller.

09/27/2011


Emerson Network Power’s Liebert iCOM controls have been added to the Liebert XDC refrigerant chiller. Providing refrigerant circulation and control in applications where the building’s chilled water system is not available, the Liebert XDC with iCOM can cool more than 30 kW per rack and 160 kW per system. With dynamic fan control, the Liebert XD Smart modules can save 50% to 70% in energy costs over traditional precision cooling methods. The Liebert XD refrigerant-based cooling modules work as a system to support the hot aisle/cold aisle approach to cooling high-density data centers. The addition of Liebert iCOM controls to the Liebert XD family of cooling solutions increases the flexibility of the data center. The Liebert XDC with iCOM and the Liebert XDP with iCOM now employ a controller-area network (CAN-bus) configuration, enabling a new communications network bridging a data center’s building management system (BMS) or data center infrastructure management (DCIM) system to Liebert XD Smart Module level.

www.emersonnetworkpower.com 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.