Erika L. Bolger

Erika L. Bolger, PE, LEED AP, is a director at Design Group Facility Solutions and has more than 30 years of consulting engineering experience.

Articles

Figure 3: Exterior diesel generator with base-mounted fuel tank. Courtesy: Design Group Facility Solutions
Electrical and Power January 31, 2024

Do you know the vital requirements for standby power?

The ability to provide power to a building or load when utility power is lost can be a critical need for a facility to support vital operations or building and occupant safety

By Erika L. Bolger
All Articles