Jumbo TES for Florida Convention Center
A new thermal-energy storage (TES) installation in Orlando is expected to cool a 1-million sq.-ft. addition to the Orange County Convention Center for 50% the cost of a new chilled water facility, reports the Orlando Utilities Commission and Trigen-Cinergy Solutions.
A new thermal-energy storage (TES) installation in Orlando is expected to cool a 1-million sq.-ft. addition to the Orange County Convention Center for 50% the cost of a new chilled water facility, reports the Orlando Utilities Commission and Trigen-Cinergy Solutions.
The new 17-million gallon tank is slated to produce 160,000 ton-hours of cooling—and up to 20,000 ton-hours at a time for up to eight hours—without the need to operate additional water chillers.
Even though the TES and associated equipment costs $5 million, Trigen-Cinergy and the Utilities Commission claim that a new chilled water facility would have cost in the range of $10 million. In addition, by running the TES at night, it’s anticipated to save $500,000 a year in electricity.
Trigen-Cinergy is a joint venture between Trigen Energy Corporation, a thermal energy specialist based in Houston, and the Cinergy Corporation with headquarters in Cincinnati.
Do you have experience and expertise with the topics mentioned in this content? You should consider contributing to our CFE Media editorial team and getting the recognition you and your company deserve. Click here to start this process.