| 2005 Arc Awards Official Application Form |
| Deadline for Nominations: October 3, 2005 |
| All fields are required. | |
| NAME/TITLE OF SUBMITTER | |
| COMPANY OR ORGANIZATION | |
| STREET/MAILING ADDRESS | |
| CITY | |
| STATE | |
| PHONE | |
| FAX | |
| NAME OF BUILDING PROJECT | |
| LOCATION (CITY/STATE) | |
| INDICATE WHICH CATEGORY (Project of the Year OR one of the systems categories) YOU WOULD LIKE YOUR SUBMISSION TO BE CONSIDERED: (NOTE: EACH SEPARATE ENTRY MUST HAVE ITS OWN APPLICATION FORM AND ENTRY FEE) | |
| I WOULD LIKE THIS ENTRY TO BE CONSIDERED IN THE PROJECT OF THE YEAR CATEGORY | |
| I WOULD LIKE THIS ENTRY TO BE CONSIDERED IN THE ONE OF THE INDIVIDUAL SYSTEM CATEGORIES | |
| THIS PROJECT INVOLVES (CHECK ONLY ONE) | |
| NEW CONSTRUCTION RETROFIT | |
| PROJECT START AND FINISH DATES | |
| THE PROJECT’S TOTAL DESIGN/CONSTRUCTION COST | |
| DESIGN COST FOR THE MECHANICAL/ELECTRICAL SYSTEMS | |
| GROSS SQUARE FOOTAGE | |
| SQUARE FOOTAGE OF USABLE SPACE | |
| PRINCIPLE MEMBERS OF THE DESIGN/SPECIFICATION TEAM (if applicable) | |
| LEAD MECHANICAL ENGINEER | |
| NAME | |
| PHONE | |
| LEAD PLUMBING ENGINEER | |
| NAME | |
| PHONE | |
| LEAD ELECTRICAL ENGINEER | |
| NAME | |
| PHONE | |
| LEAD FIRE/LIFE SAFETY ENGINEER | |
| NAME | |
| PHONE | |
| OTHER KEY MEMBERS OF THE DESIGN TEAM | |
| NAME/TITLE | |
| PHONE | |
| NAME/TITLE | |
| PHONE | |
| Any questions regarding the ARC Award program’s entry requirements and/or judging criteria can be directed to Jim Crockett, Chief Editor, at 630.288.8150, [email protected] . Submit your entry in a three-ring binder in which the Official Application Form appears as the first age in the three-ring binder. Each entry must include the following materials: 1. A completed Application Form 2. A check or money order for $125 payable to Consulting-Specifying Engineer magazine for each entry. 3. Supporting photography that includes the building’s exterior and interior, as well as pertinent mechanical, electrical and/or plumbing systems or specifically referenced engineered systems. Ideally, prints and drawings should be in a glossy 8 x 10-in. format. In addition, 35mm color slides of the prints and drawings are recommended. Also, include any other supporting documents or drawings (i.e. project schedules, diagrams or illustrations). 4. A statement regarding (A) the uniqueness of the design and specification of the project such as challenging, modern, functional or efficient systems of the building; (B) the use of new or unusual technologies; (C) results in energy efficiency or sustainability as a result of innovative design; (D) superior systems integration and interaction; (E) inventive solutions to various project challenges and architectural considerations that can include procedures for maximizing each team member’s expertise and input at appropriate junctures, means of exchanging information/ documentation among team members. The statement should not exceed eight typewritten pages. All entries and supporting entry materials (including photography) become the property of Consulting-Specifying Engineer and will not be returned. |