Project profile: Headquarters energy efficiency improvement

Franklin Energy saves 32% on electric, 48% on gas with VRF zoning systems.

09/04/2014


 

 

Project name: Franklin Energy headquarters

Project type: Existing building retrofit

Engineering Firm: Auer Steel & Heating Supply Co.

Building type: Office buildings

Location: Port Washington, WI

Timeline: January 2011 - January 2011


Franklin Energy moved its 10,000-square-foot national headquarters into a historic structure on the shores of Lake Michigan in January 2011. Courtesy: Mitsubishi Electric US Cooling & Heating Division

Project background

Franklin Energy moved its 10,000-sq-ft national headquarters into a historic structure on the shores of Lake Michigan in January 2011. The structure previously served as a city processing plant. The company had always made its headquarters a showcase for the firm's approach to energy efficiency. The newest headquarters thus needs to continue this tradition.

Challenge

Because of the building's orientation and outdated glass windows, solar gain was a huge issue for HVAC system selection.

 

Solution

The first suggestion was to install a hydronic heat system in the new headquarters, but it was rejected because it was out of step with his high energy-efficiency goals. Auer Steel & Heating Supply's then suggested a variable refrigerant flow (VRF) zoning system from Mitsubishi Electric US Cooling & Heating Division (Mitsubishi Electric). VRF zoning technology was an ideal choice for Franklin Energy for several reasons:

 

 

 

  • Ease of installation
  • Sound attenuation
  • Ability for load-sharing (not possible with conventional systems)
  • INVERTER-driven compressor
  • Small footprint and lightweight modularity of the outdoor units
  • Simultaneous cooling and heating ability

The VRF zoning system helped keep Franklin Energy’s office space comfortable all year, despite issues with solar gain. Courtesy: Mitsubishi Electric US Cooling & Heating DivisionProject results

 

 

 

  • Electric Energy Usage: CBECS average - 17.9 kWh/ft2/yr; Franklin Energy actual - 12.2 kWh/ft2/yr (32% savings)
  • Gas Energy Usage: CBECS average - 42.3 ft3/ft2/yr; Franklin Energy actual - 21.9 ft3/ft2/yr (48% savings)

 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me