Video: What do the new motor efficiency requirements mean to the end user?

At the 2010 International Manufacturing Technology Show in Chicago, Baldor Electric talks with Group Publisher Jim Langhenry about the Energy Independence and Security Act of 2007 and what the new motor efficiency requirements mean to the end user.

09/22/2010

Flash is required!

At the 2010 IMTS show at McCormick Place Convention Center in Chicago, CFE Media Group Publisher/Co-Founder Jim Langhenry interviews Product Manager George Weihrauch with Baldor Electric to discuss the Energy Independence and Security Act of 2007. The Energy Independence and Security Act (“EISA”), which was signed into law in 2007, becomes effective on December 19, 2010. This law expands the mandated energy efficiency standards from the Energy Policy Act of 1992 (EPAct) for a wider range industrial motors which are manufactured for sale in the United States.

 

For more information about the motor efficiency upgrades and how the EISA Bill will affect the end-user, read the following items:



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Pump technology design: Selecting pumps and pipes; Class A office buildings; NFPA 101-2015; ASHRAE 90.1 updates; Motors, drives, and HVAC efficiency
Renewable power systems: Designing a net zero energy building; NFPA 37; Data center design; Lighting systems
Salary survey: How much are you worth?; Dedicated outdoor air systems; Energy models and lighting
Understanding transfer switch operation; Coordinating protective devices; Analyzing NEC 2014 changes; Cooling data centers
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.