ICC and ASHE to develop building code changes for medical facilities

The collaborative effort aims to review and update the current code to ease confusion from overlapping codes and improve safety while maintaining cost effectiveness.

03/02/2011


The International Code Council (ICC) and the American Society for Healthcare Engineering (ASHE) of the American Hospital Association (AHA) are collaborating to develop a series of building code changes that will result in safe, effective, and efficient provisions for hospital and ambulatory care facilities.

“Including stakeholders in a consensus-driven approach within the Code Council’s public and transparent code development process is a formula for success and safety,” ICC CEO Richard P. Weiland said. “Together we can create broad-based, model codes that consider affordability and meet the needs of hospitals and other health care facilities without sacrificing safety.”

The joint effort, according to both organizations, aims to:

 

 

  • reduce conflicts caused by overlapping local and federal building and fire code requirements that can arise when constructing medical facilities;
  • ease the confusion between multiple authorities responsible for code enforcement of health care structures;
  • create comprehensive building and fire codes for the design and construction of new hospitals and ambulatory care facilities;
  • consistent code evaluation of existing health facilities; 
  • increase the opportunity to apply science, research, modeling and historical data in the code development process; and
  • consider cost-effective construction alternatives which do not reduce current levels of safety. 

“Our members dedicate countless financial and human resources to assure fire and building codes and standards are continuously met in our facilities,” ASHE Deputy Director, Douglas S. Erickson said. “There comes a time, however, when the value of continuously increasing fire and building code requirements has a diminishing return on investment, and that time is now.” 

As part of its commitment to this collaboration, the ICC Board has approved the creation of a 15-person Ad Hoc Committee on Health Care to review and update provisions in the International Codes that impact the construction of new and existing hospitals and ambulatory care facilities. The objective of the committee is to develop code change proposals to the International Codes that will result in the most contemporary, effective, efficient and cost-effective provisions for health care facilities to assure the highest level of safety for patients, employees and other users.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.