When you finish a project, begin working to catalog what was built, the standards used (and improved), and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration and with engineering in general. See chart and table.

06/10/2013


How much re-use are you getting out of your projects? In other words, when you finish one project what parts can you directly apply to the next? As a specific example we often ask the question:

How many projects can a great Functional Design Specification (FDS) affect before the start of a project:

- One

How many projects can a great FDS effect after the project if time is taken to complete the as-built document, add screen-shots with callouts, and file with an appropriate version number in a public space for sharing?

- 10? 20? Many.

Why then do so many projects drop the ball after the project is complete and walk away without working to catalog what was built, the standards used (and improved) and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration (and engineering in general) but if we can get move past this the potential for both individual project success as well as long term growth of the integration industry is huge. As a summary, the chart details the integration project costs (both as dollar and percentage values) for a two-plant install between continents.  The Plant 1 design and implementation contributed directly to Plant 2. All efforts listed represent direct integration costs only.

Software reuse drastically reduces system integration costs as this chart shows. Courtesy: Callisto Integration.

 

 

Software reuse drastically reduces system integration costs, as this table shows. Courtesy: Callisto IntegrationFurther to the direct integration benefits of re-use, client-centric benefits include:

 

Lower project risk – Components identified as new/different are noted as risk factors and engineering effort is spent up front mitigating that risk. As an example, a set of pre-built VM servers that can be re-used from project to project will lower the risk of incorrect software install order, unsupported patch installations, or other configuration errors, which can result in longer setup and commissioning time. 

 

·         Lower support cost – If the same standards are used across multiple sites or lines, the net training effort required for the organization drops significantly. As an example, a video-recorded training presentation which outlines application navigation and troubleshooting can be created and viewed in multiple plants and multiple languages with only one investment in content development.

 

·         Lower threshold for improvement – as an improvement is identified it can be quickly copied from one plant to another. As an example, a recipe improvement in one plant could be electronically submitted to another for next-day business return on investment (ROI).

 

·         Lower per-project design cost – Re-using software from one project to another has a direct, positive impact on business project management costs such as the total time required by H.B. Fuller employees in software reviews (43 vs. 2 as outlined in previous graph)

 

In summary: change your focus. What you do after commissioning should be held in as high regard as what you do before.

- Anthony Baker strikes again: Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. This blog provides integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. www.callistointegration.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Water use efficiency: Diminishing water quality, escalating costs; Lowering building energy use; Power for fire pumps
Building envelope and integration; Manufacturing industrial Q&A; NFPA 99; Testing fire systems
Labs and research facilities: Q&A with the experts; Water heating systems; Smart building integration; 40 Under 40 winners
Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.