Joe Guentert is owner and sole proprietor of Power Distribution Systems, located in Charlotte, N.C. He is a 1969 graduate of the University of Notre Dame (dual majors of Electrical Engineering and Business Management). He had an 18-year career with General Electric Co. with various assignments around the U.S., and worked five years as a vice president of IEM Inc., Fremont, Calif.

He founded Power Distribution Systems in 1994 in San Ramon, Calif. Since that time, the company has focused entirely on mission critical electrical power systems, with the vast majority of projects being large data centers. The company specializes in medium voltage power distribution, primary substations, medium- and low-voltage switchgear, and the integration of protective systems, control, and monitoring systems within data centers.


Efficiencies, losses of liquid versus dry-type transformers

There are important tradeoffs to be made when moving transformers from outdoor locations to inside a facility.

08/21/2012


I saw a design for very large data center project a few years ago, that used twenty-four 3,000-kVA cast resin units located inside the facility, close-coupled to low voltage switchgear, in a wise "loadcenter" approach (with RC snubbers on the primary of every unit). That arrangement probably eliminated at least a million pounds of underground copper that would have been otherwise required to connect transformers to switchgear.

However, there are important tradeoffs to be made when moving transformers from outdoor locations to inside the facility. One obvious tradeoff is that indoor electrical rooms need to be enlarged to accommodate the physical space requirements of the transformers (which can be significant, especially if they include primary air switches).

Secondly, the heat from the losses of the transformers now is exhausted to inside the building, instead of simply being vented to outdoor air. In most cases, that heat will result in additional loading on the plant’s cooling system, which usually will greatly increase the magnitude of wasted energy. You have the waste heat due to losses rejected by the transformers inside the building, plus the energy consumed by the cooling system to remove that same waste heat from the building. So, efficiency becomes even more important when moving the transformers indoors.

The table below shows a comparison of four styles of transformers, with "typical" efficiencies, in the facility in the above example. Assumptions in the table are that transformers are running at average loading of 75% and that average cost of energy is $0.07 per kWH. The right column uses the Cooper FR3 Envirotemp HDC transformer as baseline, and shows the incremental cost of the other three types, using those assumptions.

Comparison of Transformer Types and Parasitic Wasted Energy

Transformer
Construction
Type

Efficiency at
75% Average
Load

Energy Wasted
Annually,
Incl. HVAC

Incremental Annual
Cost of Wasted
Energy

FR3 Liquid HDC, 55 C

99.6%

3.80 MW-Hr

$0

Cast Coil, 80 C Rise

99.2%

8.89 MW-Hr

$356,440

VPI or Cast Coil Dry, 115 C Rise

98.7%

15.32 MW-Hr

$806,384

VPI Dry, 150 C Rise

98.4%

19.62 MW-Hr

$1,203,098


Some readers will argue that there are designs of dry-type and cast coil transformers available with higher efficiencies than those typical values listed in the table. That’s true, but improving efficiency in any dry-type design almost always involves large increases in physical size and in initial cost (and often, involves large and difficult-to-manage increases in inrush current on energization).

The point is, that a liquid HDC transformer, with its average winding temperature operating at 55 C above ambient temperature, will always produce lower losses and less heat than a dry-type transformer with its windings running at an 80 C, 115 C, or 150 C temperature above ambient air temperature.



Helping Joe on these blogs posts is Brian Steinbrecher, an electrical engineer focused on medium-voltage power distribution systems. His 30 year career includes work with an end-user (IOU), a manufacturer of power systems equipment, and as a system designer/consultant. Brian has a wide breadth of experience within the utility segment from systems design to equipment specifications and from system studies to construction and start-up. He has written many technical documents, papers, and reports and holds over a dozen active patents.

A good portion of Brian’s career was with Cooper Power Systems where he performed engineering and marketing work in behalf of their major product groups. Prior to moving into his current role, Brian was the Director of Engineering for a product group at Cooper. Brian is currently the Owner and Principal Engineer at Galt Engineering Solutions located in Brookfield, Wis.


>> Return to the Cut the Copper blog listings.


No entries

Nothing found in the guestbook.

CAPTCHA image for SPAM prevention