Westlake Reed Leskosky: Smithsonian Institution Renwick Gallery

Westlake Reed Leskosky: Smithsonian Institution Renwick Gallery

08/11/2016


Main attic mechanical room. Courtesy: Kevin ReevesEngineering firm: Westlake Reed Leskosky

2016 MEP Giants rank: 86

Project: Smithsonian Institution Renwick Gallery

Location: Washington, D.C.

Building type: Museum

Project type: Existing building retrofit

Engineering services: Automation, controls; electrical, power; HVAC, mechanical; lighting; energy, sustainability; plumbing, piping

Project timeline: March 2012 to November 2015

MEP/FP budget: $12 million

Grand stair. Courtesy: Kevin ReevesChallenges

The building was originally completed in the 1870s and is listed on the National Register of Historic Places. It was the first purpose-built art museum in the U.S. and became a Smithsonian Museum in the early 1970s. The engineering approach required sensitivity to the historic nature of the building within very tight spatial constraints. Systems are required to maintain appropriate environmental control for a varied collection (ASHRAE Class A), coupled with high visitor traffic.

Solutions

The team worked in a highly integrated manner to allow replacement systems to better use space within the existing structure without any modifications to the existing mass of the building. The team helped pioneer a new type of LED source to allow the gallery lighting power density to operate at approximately 1 W/sq ft while still providing sufficient beam control for highlighting objects from sources located relatively far away. The project has performed approximately 50% more efficiently, even with visitor attendance approximately four times higher than in 2012, prior to renovation.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me