States approve green-energy measures

Voters in Missouri and Colorado voice approval for clean/renewable energy issues.

11/17/2008


The Missouri Clean Energy Initiative —also known as Proposition C—passed overwhelmingly at the polls. The measure requires the state's investor-owned utilities to draw on renewable energy for 15% of their electricity supply by 2021.

Proposition C garnered approval from 66% of the state's voters, passing in every county but one. The statutory ballot measure defines renewable energy as wind power, solar thermal power, solar photovoltaic power, small hydropower, a variety of biomass energy sources, and fuel cells powered by hydrogen from renewable energy sources; it also allows the Missouri Dept. of Natural Resources to designate new renewable energy sources. The measure requires at least 2% of the requirement to be met with solar energy, and it requires the utilities to offer their retail customers rebates of $2 per watt for customer-owned solar power systems, up to a limit of $50,000.

In addition, voters in Boulder County, Colo., approved a ballot issue for the county to provide financing for energy efficiency and renewable energy improvements to residential and commercial properties. Modeled on a similar measure adopted by Berkeley, Calif., Boulder County Ballot Issue 1A passed easily, with unofficial results showing 63.63% of voters approving the measure. It allows Boulder County to issue up to $40 million in special assessment bonds to finance the clean energy improvements.





Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me