Sprinkler Protection of Plastics in Big Box Retail

02/22/2006


Editor’s note: The February 2006 issue of Consulting-Specifying Engineer offers a full-length feature from author Lisa Bossert, P.E., Schirmer Engineering, on fire-protection strategies in big box retail operations ( Of Stores, Storage and Sprinklering ). Readers are greatly encouraged to click the link above to read this invaluable article.


Currently, NFPA does not recognize the use of anyn of a foam insulation boards. These products create a unique fire challenge due to their plastic composition, styrofoam-like nature, and lack of cardboard packaging.

Testing will be performed at Underwriters Laboratories and will involve the actual storage configurations utilized by the big-box retail client. The objective is to determine required design parameters for supplemental rack sprinklers in combination with ceiling ESFR sprinklers. The results of these tests will most likely serve as the technical basis to amend the codes.

Similar testing has also been performed to determine ESFR protection for flammable/combustible liquids and aerosols.Schirmer Engineering teamed with the same big-box retail client and a sprinkler manufacturer to conduct full scale testing at UL to determine a method of ceiling ESFR sprinklers and control-mode rack sprinklers to protect the paint department of the big-box retail client. Protection of the aerosols also included solid horizontal barriers within the rack structure. Schirmer then proposed and navigated the test results through the adoption process of NFPA. Resultant changes included the “Specific Protection Design” criteria within the mercantile occupancy chapter of NFPA 30B [for aerosols] and portions of NFPA 30 [for flammable/ combustible liquids].





Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me