University of Utah Substation Transformer near Fort Douglas - source: Jared Kenitzer, Spectrum EngineersEngineering firm: Spectrum Engineers

2018 MEP Giants rank: 88

Project: University of Utah Campus Wide Electrical Infrastructure Upgrade

Location: Salt Lake City, UT, United States

Building type: Utilities/public works/transportation

Project type: System overhaul

Engineering services: Electrical, power

Project timeline: April 2012 to July 2017

MEP/FP budget: $6,051,666

Challenges

Coordinating a project of this magnitude is a unique challenge that required time and dedication from the entire team. Working on a project at the largest higher education institution in the state of Utah where biomedical research and emergency services are happening simultaneously can be demanding. But juggling this with the responsibility of not only creating a better electrical infrastructure but doing so with little or no shutdown was a unique challenge that Spectrum overcame. Once being selected as the lead design firm, Spectrum wanted to make sure that the provisions made would actually increase the reliability of the University's electrical system. This increased the challenge of the work. Spectrum didn't just want to suggest solutions based on things they'd done in the past, so they needed to devise a way that would measure actual results of the changes made.

University of Utah Substation near Fort Douglas - source: Jared Kenitzer, Spectrum Engineers

Spectrum was responsible for designing the electrical systems for the University's upper campus. This portion of the University of Utah's campus includes a hospital and supporting medical facilities as well as the University's medical school buildings. The team had to work carefully with the hospital still on the main utility system because if the back-up generators failed, the hospital would suffer downtime. In addition to having to work around live equipment, the undocumented construction of what was underground, and dealing with facilities that allowed for no shutdowns or service outages was a challenge that sets this project apart.

Solutions

Because of the critical nature of power reliability, Spectrum applied the IEEE Gold Book in a unique way. Spectrum's team utilized a quantitative method over a qualitative one. The use of a quantitative method was superior when predicting reliability because it helps guide decisions, backed by data, regarding the approach and priorities of the project. Spectrum used actual numbers, or "scores," to help the university to determine which areas were most at-risk and where funding was needed to improve reliability.

University of Utah East Conduit - source: Spectrum EngineersUniversity of Utah North Campus Drive Conduit - source: Spectrum EngineersUniversity of Utah Rice Eccles Stadium Bore Pit - source: Spectrum Engineers

Spectrum worked around the obstacle of not being able to remove the hospital from the main utility system by replacing one utility at a time. In addition to working carefully to keep things up and running, Spectrum had to be cautious when working around live equipment. Spectrum designed temporary feeds to keep one utility up without relying on the backup generators. This required close communication with the hospital so work could be done when an outage would be easier to accommodate.

Furthermore, the team coordinated with Rocky Mountain Power to obtain clearances, rights-of-way, and approvals. Continual communication with university staff, users, and team members was critical. This project was completed with minimized interruptions to the critical facilities and done on a campus that was fully-populated with students, staff, and other construction projects.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me