Single phase motor starter thermally protects motors up to 1 HP

Flexible, easy-to-use single-phase motor starter is building automation ready, features overload protection.

01/28/2011


Cerus IndusCerus BAS 1P Motor Startertrial Inc. produces a single phase motor starter for use with exhaust fans, unit ventilators, and fan coil units in installations that have building automation systems, occupancy sensors, or timers. With wide-range, adjustable class 10 electronic overload protection, the BAS 1P is reportedly the only single phase starter flexible enough to thermally protect all single phase motors up to 1HP.

To simplify installation, improve reliability, and reduce long term costs, the BAS 1P provides voltage-controlled or dry (normally open) inputs on the unit. No interposing relays are required to connect to control systems. System override for operations such as fireman smoke purge is facilitated, and operation of the unit can be verified via panel LEDs and via connection to normally open outputs signifying “proof of run” and “fault” status. Ordering options include manual or automatic overload trip reset.

“Unlike larger motors, which are often made to run at variable speeds to save energy, smaller motors are often left to run at full speed 100% of the time because they aren’t easy or cost effective to connect to building control systems,” said Andre Perra, president of Cerus Industrial. “Now, with the new BAS 1P, motors of 1 HP and under can also be incorporated into effective building energy management strategies.”

www.cerusind.com

Cerus Industrial Inc.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me