Setty: Howard University Interdisciplinary Research Building (HUIRB)

New construction of an educational facility; research facility/laboratory

08/17/2015


Engineering firm: Setty
2015 MEP Giants rank: 78
Project: Howard University Interdisciplinary Research Building (HUIRB)
Address: Washington, D.C., United States
Building type: Educational facility; Research facility/laboratory
Project type: New construction
Engineering services: Plumbing, piping
Project timeline: 5/8/2012 to 9/1/2015
MEP/FP budget: $325,280

Challenges

This building required a complex design of plumbing systems to serve a cleanroom and bio-lab environment in addition to the standard plumbing systems within a higher education establishment. The required plumbing systems included process-piping systems, vacuum, clean air, and chemical-waste treatment. The domestic water systems required multiple stages of purity to include high-purity and deionized water with central circulation. Lab and bulk gases included toxic and nontoxic systems. The main bulk-gas systems were N2, O2, AR, CO2, H2, HE, and LIN. The main challenges were to design the many different systems to fit within a limited space while maintaining proper maintenance clearances and service to the cleanroom. The cleanroom design requires different materials and construction execution methods that differ from non-cleanroom environments.

Solutions

Finding solutions to the engineering problems faced in this building required a great deal of experience and specialized engineering skills. Knowledge of cleanroom design, process-piping systems, bulk-gas design, and bio-lab operations was key to determine proper layouts and assuring a good fit in a limited space. Material exposure is required to be at minimum in a cleanroom environment and proper materials were carefully selected in accordance with Class 100 cleanroom requirements. In addition to the challenges involved with space limitations, a great deal of consideration was given to the functionality of the use within these spaces. The locations of all the toxic and nontoxic bulk-gas-system supplies required very careful consideration and coordination with the needs of the facility. The design also incorporated a strategic layout with the intent to accommodate flexibility in future system changes with minimal work and effort required to make those future changes.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
August 2018
MEP Giants, lighting designs, circuit protection, ventilation systems, and more
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me