Send in the engineering troops: Building automation and controls

Military facilities present an army of challenges—exacting codes and regulations, stepped-up security issues, and budgetary concerns. Building automation and controls must be compatible across multiple platforms.

07/24/2013


Kevin D. Bomboy, PE, LEED AP, Chief mechanical engineer, STV Group, Douglassville, Pa. Courtesy: STV GroupDavid Callan, PE, CEM, LEED AP, HBDP, Vice president, McGuire Engineers Inc., Chicago. Courtesy: McGuire EngineersRobert L. Crance, Mechanical engineer, Black and Veatch, Overland Park, Kansas. Courtesy: Black and VeatchJoseph H. Talbert, PE, ARM, Project manager, Aon Fire Protection Engineering, Lincolnshire, Ill. Courtesy: Aon Fire Protection EngineeringWilliam Valdez, Northwest justice and civic sector leader/principal, DLR Group, Seattle. Courtesy: DLR Group

Participants:

  • Kevin D. Bomboy, PE, LEED AP, Chief mechanical engineer, STV Group, Douglassville, Pa.
  • David Callan, PE, CEM, LEED AP, HBDP, Vice president, McGuire Engineers Inc., Chicago
  • Robert L. Crance, Mechanical engineer, Black & Veatch, Overland Park, Kansas
  • Joseph H. Talbert, PE, ARM, Project manager, Aon Fire Protection Engineering, Lincolnshire, Ill.
  • William Valdez, Northwest justice and civic sector leader/principal, DLR Group, Seattle

CSE: What factors do you need to take into account when designing building automation and controls for military facilities?

Callan: The military does not have unlimited resources. However, in many instances they have more resources than your average facility owner. Technology plays a large role in the ability to effectively operate facilities. Though not always the case, generally the military has the ability to bring a higher level of sophistication to operations. For this reason, and the fact that military projects require a longer life span, we attempt to employ highly functional and featured control systems.

Bomboy: The main issue is that the government properties typically require that no proprietary control system be used. The control system must be either BACnet or LonWorks compatible and, in some cases, both.

CSE: When re- or retro-commissioning control systems in military facilities, what challenges do you encounter, and how do you overcome these challenges?

Bomboy: The biggest challenge is when there is little or no documentation for the existing systems. The solution is a boots-on-the-ground approach with a tremendous amount of time spent on field surveying the actual control system to determine what the system was meant to control and to what parameters.

Callan: People are people. Computers do not operate buildings; people operate buildings and computers. Computers are simply a means to an end. And, in the case of control systems, many engineers do not contemplate actual living and breathing people when designing a system. If the control logic and sequences are overly complicated or obtuse, the operator must override them until he or she is confident in the ability to control the systems. It is these overrides that, we find, cause the buildings to drift from their intended operational efficiency. Usually, in these cases, revisions to the control logic are required to join the people and the technology closer together.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
August 2018
MEP Giants, lighting designs, circuit protection, ventilation systems, and more
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me