Satisfying NFPA 110 and NEC requirements

Consulting engineers who specify emergency power equipment should identify when installations are required to comply with NFPA 110 in conjunction with other codes. This collection of case studies provides examples of recent projects that had various challenges associated with these requirements.

12/06/2017


This article is peer-reviewed.Learning objectives:

  • Learn about the core codes and standards that define how electrical engineers will design health care facilities.
  • Review examples of how to design standby and emergency power systems.
  • Analyze best practices to design for additional capacity and modern code compliance.

Designers commonly encounter existing facilities in need of emergency power system upgrades or additions. This article offers four case studies where the NFPA 99: Health Care Facilities Code identified the need for an emergency power system that required the engineering team to provide an increase in standby capacity while identifying opportunities for system improvements.

NFPA 110: Standard for Emergency and Standby Power Systems identifies requirements for the design, installation, and testing of standby power systems. The tables in the 2016 edition of NFPA 110 identify minimum runtime (class) and power restoration time (type) for these systems. On-site fuel storage for each site varied between existing or new, and each satisfied the Facility Guidelines Institute (FGI) guidelines for health care facilities for a minimum of 24 hours of runtime. The actual runtime for each case study varies based on local requirements and site classifications, as noted in 2016 NFPA 110 Annex A 4.2.

In 2016, the Centers for Medicare & Medicaid Services (CMS) adopted the 2012 editions of NFPA 99 and NFPA 101. The 2012 editions of NFPA 99 and NFPA 101: Life Safety Code reference the 2010 edition of NFPA 110. Chapter 4 of 2010 NFPA 110 defines the classification of emergency power supply systems (EPSS). NFPA 110 also defines the classifications of emergency power systems (EPS).

To simplify the difference, EPS are components that produce electricity and EPSS are components that distribute electricity from the EPS.  EPSS components include paralleling gear, transfer switches, distribution panels, and panelboards.   

The projects described below were in construction prior to the CMS adoption of 2012 edition of NFPA 101 and 2012 edition of NFPA 99. These projects were under the 1999 edition of NFPA 110 and 2000 edition of NFPA 101 for state licensing and had co-compliance with 2010 NFPA 110 for local jurisdictions. However, to provide an up-to-date discussion, the references to NFPA 110 in this article are to the 2016 edition, unless otherwise noted.

When existing emergency power systems are updated or replaced, the design engineer must review impacts to the existing distribution while planning for future expansion. Designing system upgrades goes beyond the final configuration and the engineer determine solutions that overcome implementation challenges. This article focused on four case studies in which existing health care campuses were in need of both additional capacity and modern code compliance. Each project is an example of how the design team communicated with the facility and construction team to identify needs and wishes and evaluated the existing system for opportunities for cost-effective corrections to existing conditions and future capacity.


Richard Vedvik is senior electrical engineer and acoustics engineer at IMEG Corp. He is a member of the Consulting-Specifying Engineer editorial advisory board.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Knowing when and how to use parallel generators
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me