A new factory-acceptance testing lab is designed to provide performance testing for power systems serving server rooms and large-scale data centers. The facility was developed at American Power Conversion 's headquarters in West Kingston, R. I. It is intended for the company's own customers, as well as for consulting engineers and contractors involved in specifying and building large power systems and protection schemes that include multiple, parallel UPS systems.

Evaluation capabilities include system efficiency testing, steady-state load and step-load testing, input frequency and voltage variation, utility failure, battery performance and system input and output faults.

The lab is intended to complement the company's thermal test lab in Kolding, Denmark , and includes a 3.3-MVA electrical service input, 2-MW generator capability, 1-MVA variable transformer, a 3.2-MVA resistive/reactive load bank and dedicated test-bay switchgear. Testing and measurement equipment conforms to the requirements of the National Institute of Standards and Technology .





Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
June 2018
Chilled-water system design, NFPA 99, Grounded power supply systems
May 2018
40 Under 40 winners, fire and life safety, performance-based designs, and more
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me