When owners of the North La Quinta Inn in St. Petersburg, Fla., decided to replace the facility's three aging water-heating systems, they were faced with the problem of keeping the old units in operation while installing the new ones. For this particular inn, designers specified three 150,000-Btu units....

01/01/2001


When owners of the North La Quinta Inn in St. Petersburg, Fla., decided to replace the facility's three aging water-heating systems, they were faced with the problem of keeping the old units in operation while installing the new ones. For this particular inn, designers specified three 150,000-Btu units.

However, installation of these new units posed some challenges: a remarkably narrow mechanical room with limited space to maneuver and the need to continue providing hot water for guests during the changeover.

Providing an uninterrupted supply of hot water during a changeover is a requirement, and under normal circumstances is not a problem. Usually, the new equipment is installed in the mechanical room and put on line before the existing equipment is removed.

An unusual installation

In this case, however, the mechanical room was only three feet wide; a routine installation was not an option. The solution was to preplumb all the new heaters, run the necessary electrical conduit and perform any additional tasks in advance of the changeover.

Finally, at a predetermined time, the installation crew pulled all the old equipment out of the mechanical room. The first new unit was placed, the plumbing and venting was completed and the unit was started up. This single unit carried the entire hot-water demand until the two other units had been installed-about four hours later.

For more information about water-heating units from A. O. Smith, circle 102 on the Reader Service Card on page 77.





Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me